One of the most intricate operations has begun at the National Stadium – the elevation of the roof line structure. Until January 4 the 70-meter spire will be elevated to the height of 34 meters above the pitch by means of 72 steel ropes. The central point of construction – a huge spire with “garage” mounted on it for the movable part of the roof will be elevated by more than 40 meters. The whole “big lift” operation (described in such a way by the builders) will take several days. […]
Tag Archives: roof
- Polish national team head coach Smuda announced the Euro 2012 provisional roster
- Poland claims Euro 2012 security preparations progress as scheduled
- Camps are being built for the Euro 2012. It will be a paradise for fans!
- Wroclaw stadium ready for the Poland – Portugal match
- Poland national football team – reflections before Euro 2012
Sports betting
Tags
Championships
Chorzów
construction
Donetsk
Drzewiecki
euro 2008
Euro 2012
European Championships
FARE
football
Gdansk
germany
Grzegorz Lato
hotels
Hryhorij Surkis
Infrastructure
Kharkiv
kiev
Kraków
Kyiv
Lviv
lvov
Michael Platini
Michel Platini
national stadium
never again
Olympic Stadium
photos
Platini
Poland
Poznan
Preparations
problems
PZPN
racism
soccer
sport
stadium
Stadiums
tickets
UEFA
Ukraine
Video
warsaw
wroclaw